SCAFFOLDING SYSTEMS
   
 

Scaffolding System Component,

With the easy assemblig, dismantling features utilising for many reuses its economy and proven quality, Çözümsan multipurpose scaffolding system is best known construction tool of modern construction sites. Through the years, Çözümsan has been producing construction elements attributing quality, speed and economy to the construction industry with a specialised staff and modern technology Through the years, Çözümsan has been producing construction elements attributing quality, speed and economy to the construction industry with a specialised staff and modern technology.

Quality of material and pipe thickness should be considered when comparing scaffolding systems. This is the reason why they choose us.

 

 
 
 
 
Scaffolding Vertical Connection Members
 

Vertical scaffolding members are made by using 48.3-3 mm diameter pipes. If these vertical members should carry heavier loads or if the facade is much higher, then 60.3-3 mm diameter pipes must be preffered. In order to fix the horizontal members to verticals, 8 mm thick flanges at 100 cm intervals are used.

Above diagram shows the efficient and reasonable fixing method of work scaffoldings. Horizontal members may be fixed to verticals in a 100 cm row. Adjustment screws ensures scaffolding to be used in sloping ground surfaces. Starting members are used for fixing vertical connections.

   
 
How to build a facade scaffolding
 
• Adjustment screw are placed according to the lenght of horizontal members on the ground and wingnuts on the screws are levelled in the same line.
• Starting members are installed on the adjustment screws.
• Long and short horizontal members are connected to the flanges on the starting members. Long horizontal members(3.0 m - 2.5 m - 2.0 m and 1.5 m) are connected to these vertical members. Spaces between members should be maximum 2.0 m at the front side and 1.0 m at the opposite side.
• Short horizontal members (0.65 m) are also connected each in 2.0 m. (Scaffolding depth becomes 0.70 m)
• Facade scaffolding can be up to 21 m. Scaffolding must be fixed to the building.
• If the scaffoldings is higher than 21 meters, 0.95 m short horizontal members are used to fix sides together. External diagonal members must be used to avoid side sway.
• For further details it is recommended to contact our technical department
Safety
• The scaffolding must be fixed to the building in several points.
• Special metal planks should be used to avoid slipping.
• Wedges are fixed to flanges of vertical members. These wedges should be fixed by a hammer.
• For higher buildings (35 m. and higher) please consult to our technical department.
• Damaged parts should not be used.
• Specially produced Çözümsan metal ladders should be used.
• A regular maintenance is neccesary. The equipments should stay avay from humidity and be painted when needed.
• Handle with care and do not use for another purposes.
• Store the equipment in proper spaces
   
  Movable Scaffolding System
 
Çözümsan multipurpose scaffolding system can be modified to a movable scaffolding by adding wheels. The lockable wheels ensures safety during to painting, plastering and it saves money and time.
   
  Stair Towers
 
The stair towers are used at subway shafts, viaduct piers where access is required during construction. These towers are easy for erection and dismantling and its safe for workers. Towers are attached to the existing structure therefore there is no height limitation during their use.
   
   
 

Ayasofya Restorasyonu (İSTANBUL)

Merkez Cami (ADANA)

İzmir- Aydın Otoyolu Viyadük Ayağı Merdiven Kulesi

   
   
 
   
 
MOVABLE PLATFORM CHASSIS:
 
                     
   
  SCAFFOLDING VERTICAL CONNECTION MEMBERS:
  Vertical members for scaffolding made by using 48.3-3 mm diameter pipes may be used for lower buildings. If these vertical members should carry havier load if the facade is much higer, then 60.3-3 mm diameter pipes must be prefered. In order to fix the horizontal members to verticals, 8 mm thick flanges at 100 cm intervals are used.